翻訳と辞書
Words near each other
・ 794 Naval Air Squadron
・ 795
・ 795 Fini
・ 795 Naval Air Squadron
・ 7958 Leakey
・ 795th Bombardment Squadron
・ 796
・ 796 Naval Air Squadron
・ 796 Sarita
・ 7968 Elst–Pizarro
・ 797
・ 797 BC
・ 797 Montana
・ 797 Naval Air Squadron
・ 798
798 Art Zone
・ 798 Naval Air Squadron
・ 798 Ruth
・ 7985 Nedelcu
・ 79896 Billhaley
・ 799
・ 799 Gudula
・ 799 Naval Air Squadron
・ 79912 Terrell
・ 7999 Nesvorný
・ 79a Squadriglia
・ 79P/du Toit-Hartley
・ 79th (CTA station)
・ 79th Academy Awards
・ 79th Air Refueling Squadron


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

798 Art Zone : ウィキペディア英語版
798 Art Zone

798 Art Zone (), or Dashanzi Art District, is a 50-year-old decommissioned military factory buildings with unique architectural style. Located in Dashanzi, Chaoyang District of Beijing, that houses a thriving artistic community. The area is often called the 798 Art District or Factory 798 although technically, Factory #798 is only one of several structures inside a complex formerly known as 718 Joint Factory. The buildings are within alleys number 2 and 4 on Jiǔxiānqiáo Lù (酒仙桥路), south of the Dàshānziqiáo flyover (大山子桥).
==Construction==

The Dashanzi factory complex began as an extension of the "Socialist Unification Plan" of military-industrial cooperation between the Soviet Union and the newly formed People's Republic of China. By 1951, 156 "joint factory" projects had been realized under that agreement, part of the Chinese government's first Five-Year Plan. However the People's Liberation Army still had a dire need of modern electronic components, which were produced in only two of the joint factories. The Russians were unwilling to undertake an additional project at the time, and suggested that the Chinese turn to East Germany from which much of the Soviet Union's electronics equipment was imported. So at the request of then-Premier Zhou Enlai, scientists and engineers joined the first Chinese trade delegation to East Germany in 1951, visiting a dozen factories. The project was greenlighted in early 1952 and a Chinese preparatory group was sent to East Berlin to prepare design plans. This project, which was to be the largest by East Germany in China, was then informally known as Project #157.
The architectural plans were left to the Germans, who chose a functional Bauhaus-influenced design over the more ornamental Soviet style, triggering the first of many disputes between the German and Russian consultants on the project. The plans, where form follows function, called for large indoor spaces designed to let the maximum amount of natural light into the workplace. Arch-supported sections of the ceiling would curve upwards then fall diagonally along the high slanted banks or windows; this pattern would be repeated several times in the larger rooms, giving the roof its characteristic sawtooth-like appearance. Despite Beijing's northern location, the windows were all to face north because the light from that direction would cast fewer shadows.
The chosen location was a 640,000 square metres area in Dashanzi, then a low-lying patch of farmland northeast of Beijing. The complex was to occupy 500,000 square metres, 370,000 of which were allocated to living quarters. It was officially named Joint Factory 718, following the Chinese government's method of naming military factories starting with the number 7. Fully funded by the Chinese side, the initial budget was enormous for the times: 9 million rubles or approximately 140 million RMB (US$17 million) at today's rates; actual costs were 147 million RMB.
Ground was broken in April 1954. Construction was marked by disagreements between the Chinese, Soviet and German experts, which led at one point to a six-month postponement of the project. The Germans' harshest critic was the Russian technology consultant in charge of Beijing's two Soviet-built electronics factories (714 and 738), who was also head consultant of the Radio Industrial Office of the Second Ministry of Machine Building Industry. The disputes generally revolved around the Germans' high but expensive quality standards for buildings and machines, which were called "over-engineering" by the Russians. Among such points of contention was the Germans' insistence, historical seismic data in hand, that the buildings be built to withstand earthquakes of magnitude 8 on the Richter scale, whereas the Chinese and Russians wanted to settle for 7. Communications expert Wang Zheng, head of Communications Industry in the Chinese Ministry of National Defense and supporter the East German bid from the start, ruled in favor of the Germans for this particular factory.
At the height of the construction effort, more than 100 East German foreign experts worked on the project. The resources of as many as 22 of their factories supplied the construction; at the same time, supply delays were caused by the Soviet Red Army's tremendous drain on East Germany's industrial production. The equipment was transported directly through the Soviet Union via the Trans-Siberian railway, and a 15 km track of railroad between Beijing Railway Station and Dongjiao Station was built especially to service the factory. Caltech-educated scientist Dr. Luo Peilin (罗沛霖), formerly head of the preparatory group in 1951-1953, was Head Engineer of Joint Factory 718 during its construction phase. Dr. Luo, now retired in Beijing, is remembered by his former colleagues as a dedicated perfectionist whose commitment to the obstacle-strewn project was a major factor of its eventual success.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「798 Art Zone」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.